Two-stage Dynamic Path Planning for Multiple AGV Scheduling Systems
LIU Guodong1,2,3, QU Daokui1,2, ZHANG Lei1,2
1. Shenyang Institute of Automation, Chinese Academy of Sciences, Shenyang 110016, China; 2. SIASUN Robot & Automation Co., Ltd., Shenyang 110016, China; 3. Graduate School of the Chinese Academy of Sciences, Beijing 100039, China
Abstract:In order to shorten the R&D period of AGV(automated guided vehicle) systems, reduce the cost of R&D, find out universal scheduling strategy for different maps, and improve robustness to actual scheduling tasks and malfuct, a two-stage dynamic path planning strategy is developed. Multiple AGV scheduling systems are controlled with the two-stage control strategy, and paths are acquired by dynamic path planning. Several AGVs' paths are planned simultaneously in real time and path optimization is achieved with a heuristic algorithm in dynamic path planning. It is proved with simulation that the strategy improves flexibility of AGV systems and is a universal scheduling strategy for different maps.
[1] Wu NQ, Zhou MC. AGV routing for conflict resolution in AGV systems [A].Proceedings of the 2003 IEEE International Conference on Robotics and Automation [C]. Taipei Taiwan: IEEE,2003.1428-1433. [2] Rcszkowska E.Undirected colored Petri net for modelling and supervisory control of AGV systems[A]. Proceedings of the 6th International Workshop on Discrete Event Systems[C]. Los Alamitos,CA,USA: IEEE,2002.135-142. [3] 李晓萌,杨煜普,许晓鸣.基于递阶强化学习的多智能体AGV调度系统[J].控制与决策,2002,17(3):292-296. [4] Miller R D.Automated Guided Vehicles and Automated Manufacturing[M].Dearborn, Michigan: Society of Manufacturing Engineers,1987. [5] Lee J H,Lee B H, Choi M H.Real-time traffic control scheme of multiple AGV systems for collision free minimum time motion: a routing table approach [J].IEEE Transactions on Systems,Man, and Cybernetics-Part A: Systems and Humans,1998,28(3):347-358. [6] Deo N,Pang C Y.Shortest-path algorithms: taxonomy and annotation[J]. Networks,1984,14(2):275-323. [7] Dijkstra E W.A note on two problems in connexion with graphs[J].Numerische Mathematic,1959,1(2):269-271. [8] Maza S,Castagna P. Conflict-free AGV routing in bi-directional network [A].Proceedings of the 8th IEEE International Conference on Emerging Technologies and Factory Automation[C].Piscataway, NJ, USA:IEEE,2001.761-764. [9] Benita M B. System reliability and congestion in a material handling system[J]. Computers & Industrial Engineering,1999,36(3):673-684.